Skip to content

Construction · Healthcare

Rehabilitation of Building A, Hospital Dr. António Carvalho — COVID-19 Treatment Facility

  • Construction
  • Electrical
  • Healthcare

Upgrading Building A to serve as a dedicated COVID-19 treatment facility, bringing it up to critical health, safety and infection control standards.

Scope of work

  • Structural assessment and reinforcement of floors, walls and ceilings
  • Reconfiguration into isolation wards, ICU and treatment areas in easy-to-clean, contamination-resistant materials
  • Negative-pressure HVAC, upgraded plumbing and electrical networks, and backup power
  • Medical gas systems — oxygen, vacuum and compressed air lines
  • Infection control — handwashing stations, medical waste systems, antimicrobial surfaces and UV disinfection units
  • Full system testing, disinfection and staff training before commissioning

Project photographs