Emergency Borehole and Transmission Line to the Golgota Reservoir

  • Construction
  • Electrical
  • Infrastructure

A response to the water crisis in Golgota: drilling a high-capacity borehole and installing a transmission pipeline to the existing reservoir, providing immediate and sustainable access to clean water for domestic use.

Scope of work

  • Site survey and high-capacity deep borehole drilling
  • Installation of a submersible pump and electrical power system
  • Transmission pipeline to the reservoir
  • Connection to the existing water storage system