A response to the water crisis in Golgota: drilling a high-capacity borehole and installing a transmission pipeline to the existing reservoir, providing immediate and sustainable access to clean water for domestic use.
Scope of work
- Site survey and high-capacity deep borehole drilling
- Installation of a submersible pump and electrical power system
- Transmission pipeline to the reservoir
- Connection to the existing water storage system
